Asphalt paving built on a base that lasts

New asphalt for homes, businesses and private roads across Central and West Texas. We prepare the ground properly, lay hot-mix asphalt at the right thickness and compact it so it stands up to Texas heat and heavy traffic.

Serving Waco, Central Texas, DFW and West Texas

Prime Asphalt paver laying hot-mix asphalt

How we do it

Most asphalt failures start underneath. Before we pave, we excavate soft spots, grade for drainage and build a compacted base suited to the traffic it will carry, from a family car to loaded trucks.

We then lay hot-mix asphalt, roll it while it is at the right temperature and finish the edges cleanly. Every job gets a clear written estimate, and we keep you updated on timing from start to finish.

What goes into a paving job

  • Site prep: removing old pavement where needed, digging out soft or clay-heavy spots and setting the grade so water drains off the surface.
  • Base: crushed rock laid and compacted in lifts. The base carries the load; the asphalt is the wearing surface.
  • Paving: hot-mix asphalt placed at the right thickness for the traffic and rolled while hot so it compacts properly.
  • Finish: clean edges, smooth transitions to garages, roads and concrete, and striping for lots.

Paving in Texas soil and heat

Much of Central Texas sits on expansive clay that swells when wet and shrinks in drought, and summer sun bakes asphalt hard. Both are why base and drainage matter more here than almost anywhere. A thicker, well-compacted base, good grading and sealcoating on schedule are what let asphalt last 15 to 20 years or more instead of cracking within a few seasons.

After we pave

Stay off new asphalt with vehicles for at least 24 hours and up to 72 hours, longer in hot weather. For the first few weeks, avoid sharp turns in place and parking heavy trailers or equipment in one spot. Plan the first sealcoat about six months to a year after paving, then every two to three years.

Planning a project? See planning a paving project from estimate to first drive, concrete vs. asphalt and how to hire a paving contractor.

Our process

What to expect

1. Site visit and estimate

We measure, look at drainage and the existing surface, and give you a written price.

2. Prepare the base

Excavation where needed, grading and compaction.

3. Pave and compact

Hot-mix asphalt laid and rolled to a smooth, even finish.

4. Final walkthrough

We walk the job with you and explain how to care for new asphalt.

A good fit for

  • New driveways and parking areas
  • Replacing failed or crumbling asphalt
  • Private roads and subdivision streets
  • Shop, barn and equipment yards

Where we work

We serve Waco and Central Texas from our Waco office, and the Permian Basin from our Big Spring office.

Waco office

3096 New Dallas Hwy, Suite A
Waco, TX 76705

(817) 689-8965

Big Spring office

7400 S Service Rd
Big Spring, TX 79720

(432) 296-1213

Also: 1-800-BLACKTOP

FAQ

Asphalt Paving questions

How thick should my asphalt be?

Driveways are usually 2 to 3 inches over a compacted base; areas with trucks and equipment need more. We size it to the traffic on your estimate.

When can I drive on new asphalt?

Usually after 24 to 72 hours, depending on the weather. We will tell you on the day.

Asphalt or tar and chip?

Asphalt is smoother and better for heavy, turning traffic. Tar and chip costs less over long distances. We are happy to price both.

How long does asphalt paving last in Texas?

A well-built asphalt surface on a proper base commonly lasts 15 to 20 years or more with crack sealing and sealcoating every two to three years. Poor base or drainage is the most common reason it fails early.

What affects the price of asphalt paving?

Size and shape of the area, removal of old pavement, how much base work the ground needs, asphalt thickness for the traffic it will carry, drainage work and access for trucks and equipment. We spell each of these out in a written estimate.

Related services

You might also need

Asphalt Driveways

A smooth new driveway that adds curb appeal and stands up to Texas weather.

Parking Lot Paving

New parking lots laid out, paved and striped for customers and heavy traffic.

Commercial Paving

Paving for businesses, industrial yards and equipment areas, on your schedule.

Free estimates

Get a free asphalt paving estimate

Tell us about the job. We reply within one business day, usually the same day.

  • Free, no-pressure estimates
  • Residential, commercial and ranch jobs
  • Family owned and operated since 2007

Waco office

3096 New Dallas Hwy, Suite A
Waco, TX 76705

(817) 689-8965

Big Spring office

7400 S Service Rd
Big Spring, TX 79720

(432) 296-1213

Also: 1-800-BLACKTOP

Request a free estimate

Free Estimate