Parking lot paving built for daily traffic
A parking lot is the first thing your customers see. We build new lots and replace failed ones for businesses, churches, schools and HOAs, with drainage, thickness and layout planned for the traffic you get.
Serving Waco, Central Texas, DFW and West Texas

How we do it
We plan the lot around how it is used: where trucks turn, where water should go and how many spaces you need. Then we build the base, pave with hot-mix asphalt and stripe the finished lot.
We schedule the work to keep your business open where we can, in phases if needed.
Built for how your lot is used
A lot for customer cars, a church lot used twice a week and a yard where loaded trucks turn all day need very different builds. We size the base and asphalt thickness to the heaviest vehicles that will use each area, and often build drive lanes, dumpster areas and truck turns heavier than the parking stalls. Where trucks pivot in place or dumpsters sit, a concrete pad can save repeated repairs.
Drainage first
Standing water is the fastest way to ruin a lot. We grade every lot so water runs to the edges, curbs or inlets instead of sitting in low spots, and we check how water reaches the lot from roofs and neighboring property before we pave.
Lifespan and upkeep
A well-built lot that is crack sealed and sealcoated on schedule commonly lasts 15 to 20 years or more before it needs major resurfacing. Plan on sealcoating every two to three years and restriping every one to two years in busy lots. We can put that schedule in writing so the costs are predictable.
Read the property manager’s guide to parking lot maintenance.
Our process
What to expect
1. Plan and price
Layout, drainage and a written estimate.
2. Base
Excavation, grading and compaction.
3. Pave
Hot-mix asphalt at the right thickness.
4. Stripe
Spaces, arrows, ADA markings and fire lanes.
A good fit for
- New businesses and expansions
- Lots too far gone to repair
- Churches, schools and HOAs
- Truck and equipment parking
Where we work
We serve Waco and Central Texas from our Waco office, and the Permian Basin from our Big Spring office.
Also: 1-800-BLACKTOP
FAQ
Parking Lot Paving questions
Can you keep my business open?
Usually, by paving in sections and scheduling around your hours.
Do you handle striping and ADA spaces?
Yes, striping is part of the job.
How long does a new lot take?
Most small to mid-size lots take a few days, plus curing time before striping.
How long does a new parking lot last?
A well-built lot that is crack sealed and sealcoated on schedule commonly lasts 15 to 20 years or more before major resurfacing.
Asphalt or concrete for a parking lot?
Asphalt costs less up front and is quicker to build and repair, so it is the usual choice for most of a lot. Concrete makes sense for small, heavily loaded spots such as dumpster pads and truck turning areas.
Related services
You might also need
Parking Lot Repair & Maintenance
Patching, crack sealing, sealcoating and restriping to keep your lot safe and sharp.
Parking Lot Striping
Crisp lines, arrows, ADA spaces and fire lanes that keep traffic moving.
Commercial Paving
Paving for businesses, industrial yards and equipment areas, on your schedule.
Free estimates
Get a free parking lot paving estimate
Tell us about the job. We reply within one business day, usually the same day.
- Free, no-pressure estimates
- Residential, commercial and ranch jobs
- Family owned and operated since 2007
Also: 1-800-BLACKTOP
