Asphalt resurfacing & overlay new surface, without the tear-out
If your asphalt is worn and cracked on top but solid underneath, an overlay gives you a smooth new surface for far less than full replacement. We resurface driveways, parking lots and private roads.
Serving Waco, Central Texas, DFW and West Texas

How we do it
We clean the existing surface, repair any failed spots, mill high areas and edges where needed for a smooth transition, then lay and compact a new layer of hot-mix asphalt over the top.
Resurfacing is only worth it when the base is sound, so we check first. If the base has failed, we will tell you, and quote the repair that will actually last.
When an overlay is the right call
- The surface is faded, rough or covered in small cracks, but it is not sinking or breaking apart.
- Patches have piled up and the pavement looks like a quilt.
- Water drains off properly and the base is still firm.
If large areas are alligator cracked, rutted or soft, or the pavement has already been overlaid and is failing again, the problem is underneath, and a new layer on top will crack the same way. That is when we recommend repairing the base first or replacing the section.
How thick, and how long it lasts
An overlay is typically around 1.5 to 2 inches of new hot-mix asphalt. Where it meets garages, sidewalks, gutters or roads, we mill the edges so the new surface sits flush instead of leaving a lip. On a sound base, a resurfaced driveway or lot often lasts 8 to 15 years with regular sealcoating, at a fraction of the cost and time of tearing it out.
Not sure which you need? Read repair, resurface or replace.
Our process
What to expect
1. Assess the base
We make sure an overlay will hold.
2. Repair and mill
Bad spots fixed; edges and high spots milled.
3. Overlay
New asphalt laid and compacted.
4. Stripe if needed
Parking lots restriped once the new surface cures.
A good fit for
- Faded, worn or lightly cracked asphalt
- Parking lots that need a new look for customers
- Driveways with a sound base but a rough surface
- Roads with surface wear but no base failure
Where we work
We serve Waco and Central Texas from our Waco office, and the Permian Basin from our Big Spring office.
Also: 1-800-BLACKTOP
FAQ
Asphalt Resurfacing & Overlay questions
How long does an overlay last?
Commonly 10 to 15 years or more, depending on traffic and how sound the base is.
Is resurfacing cheaper than new asphalt?
Usually, yes, because the old asphalt stays as part of the structure.
Can you overlay concrete?
Sometimes. We look at the concrete’s condition and joints before recommending it.
How thick is an asphalt overlay?
Typically around 1.5 to 2 inches of new hot-mix asphalt, with edges milled where it meets garages, concrete or the street so the transition is smooth.
Will the old cracks show through?
Cracks that come from a failing base can reflect through a new layer, which is why we repair those areas before overlaying. Small surface cracks are sealed and covered.
Related services
You might also need
Asphalt Repair & Patching
Potholes, broken edges and failed patches fixed before they spread.
Parking Lot Striping
Crisp lines, arrows, ADA spaces and fire lanes that keep traffic moving.
Sealcoating
Protect asphalt from sun, water and oil, and bring back that deep black finish.
Free estimates
Get a free asphalt resurfacing & overlay estimate
Tell us about the job. We reply within one business day, usually the same day.
- Free, no-pressure estimates
- Residential, commercial and ranch jobs
- Family owned and operated since 2007
Also: 1-800-BLACKTOP
