Parking lot paving built for daily traffic
A parking lot is the first thing your customers see. We build new lots and replace failed ones for businesses, churches, schools and HOAs, with drainage, thickness and layout planned for the traffic you get.
Serving Waco, Central Texas, DFW and West Texas

How we do it
We plan the lot around how it is used: where trucks turn, where water should go and how many spaces you need. Then we build the base, pave with hot-mix asphalt and stripe the finished lot.
We schedule the work to keep your business open where we can, in phases if needed.
Our process
What to expect
1. Plan and price
Layout, drainage and a written estimate.
2. Base
Excavation, grading and compaction.
3. Pave
Hot-mix asphalt at the right thickness.
4. Stripe
Spaces, arrows, ADA markings and fire lanes.
A good fit for
- New businesses and expansions
- Lots too far gone to repair
- Churches, schools and HOAs
- Truck and equipment parking
Where we work
We serve Waco and Central Texas from our Waco office, and the Permian Basin from our Big Spring office.
Also: 1-800-BLACKTOP
FAQ
Parking Lot Paving questions
Can you keep my business open?
Usually, by paving in sections and scheduling around your hours.
Do you handle striping and ADA spaces?
Yes, striping is part of the job.
How long does a new lot take?
Most small to mid-size lots take a few days, plus curing time before striping.
Related services
You might also need
Parking Lot Repair & Maintenance
Patching, crack sealing, sealcoating and restriping to keep your lot safe and sharp.
Parking Lot Striping
Crisp lines, arrows, ADA spaces and fire lanes that keep traffic moving.
Commercial Paving
Paving for businesses, industrial yards and equipment areas, on your schedule.
Free estimates
Get a free parking lot paving estimate
Tell us about the job. We reply within one business day, usually the same day.
- Free, no-pressure estimates
- Residential, commercial and ranch jobs
- Family owned and operated since 2007
Also: 1-800-BLACKTOP
